Have an account?

  •   Personalized content
  •   Your products and support

Need an account?

Create an account

Case Study: Mayfran International

Revolutionizing work life

By using Cisco HyperFlex, Mayfran International has completely transformed the work of its engineers, who can now engage customers regularly and more resourcefully. With HyperFlex, engineers can open 3D models 80% faster, eliminating stress and wasted time.

Customer Highlights

Challenges

  • Running out of resources
  • Engineers need to be able to work from anywhere
  • Complex 3D models take a long time to load

Solutions

  • Cisco HyperFlex Systems for complete hyperconvergence
  • Replaced physical workstations with graphics-accelerated virtual desktops

Results

  • Reduced time to open designs by 80%
  • Ability to respond to customer demands faster
  • Increased efficiency through multitasking capabilities

What they’re saying

"Before, it would take 15-20 minutes to open each design file. Now it only takes four minutes."

Clint Nagy, Project Engineer, Mayfran International

Who is Mayfran International?

Industry: Machine Manufacturing
Location: Mayfield Village, Ohio
Company Size: 250 employees